
[Oct-2023] E_S4HCON2022 Dumps Full Questions - SAP Certified Technology Specialist Exam Study Guide
Exam Questions and Answers for E_S4HCON2022 Study Guide
NEW QUESTION # 11
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Software update
- B. Migration
- C. Conversion
- D. Main import
Answer: B,C
NEW QUESTION # 12
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Unicode conversion
- B. Custom code analysis
- C. Software update
- D. Database migration
Answer: C,D
NEW QUESTION # 13
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
- A. ATC (ABAP Test Cockpit)
- B. SE80 (Object Navigator)
- C. SYCM (Simplification Database Content)
- D. SAT (Runtime Analysis)
Answer: A,B
NEW QUESTION # 14
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
- B. AA
Answer: A
NEW QUESTION # 15
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question
- A. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
- B. Check the dump size of the database export on disk.
- C. Check the log files written in the SUM directory subdirectory abap. subdirectory log
- D. Check the Charts Control Center in the SUM Ul
Answer: B,C
NEW QUESTION # 16
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
- B. You need to build up an SI check framework by applying SAP Notes
- C. The SI checks are executed in the development system and the results are transported into the subsequent systems
- D. The errors from the SI checks must be solved, otherwise. SUM will report an error
Answer: A,B
NEW QUESTION # 17
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. A Standalone SAP system with ABAP 7.51 or above
- B. An SAP S4HANA 1709 sandbox system
- C. AA
Answer: A,B
NEW QUESTION # 18
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the activation
- B. To optimize the conversion
- C. To optimize the migration
- D. To optimize the main import
Answer: C
NEW QUESTION # 19
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- B. You need to build up a SI check framework by applying SAP notes.
- C. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- D. Depending on the SAP S/4HANA version, there are different SI check frameworks.
Answer: B,D
NEW QUESTION # 20
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
- A. Apply the corresponding SAP note via SAP Note Assistant
- B. Generate it by analyzing the specific custom code via RFC
- C. Configure it within transaction ATC
- D. Download it from SAP Support Portal
Answer: D
NEW QUESTION # 21
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. TABIMJJPG
- B. PARMVNT_UPG
- C. PARDIST_SHD
- D. TABIM_SHADOW_*
Answer: A
NEW QUESTION # 22
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
- A. The source system is non-Unicode and the target database is a scale-out system.
- B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- C. Network capacity between exporting and importing R3load processes must be.
- D. SAP HANA Landscape Reorganization required a manual step to edit a file.
- E. The target database size increases temporarily because of the Shadow Repository.
Answer: B,D
NEW QUESTION # 23
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. The corrections to the SUM Guide
- B. AA
- C. The link to different patch levels to SUM
- D. An overview about possible upgrade paths
Answer: A,C,D
NEW QUESTION # 24
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:
- A. Credentials of user DDIC in the development client of the development system
- B. Credentials of a named user in client 000 of the shadow system
- C. Credentials of user DDIC in client 000 of the shadow system
- D. Credentials of a named user in the development client of the development system
Answer: B
NEW QUESTION # 25
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
- A. Benchmark tool
- B. SAP S/4HANA conversion including DMO
- C. SAP S/4HANA conversion without DMO
- D. DMO without system update
- E. Prerequisite check
Answer: B,C,E
NEW QUESTION # 26
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the main configuration option "Single System" in case of an upgrade.
- B. Using the main configuration option "Standard" when applying SAP Support Packages
- C. Using the main configuration option "Single System" when installing an Add-On
- D. Using the database migration option (DMO) for SUM
Answer: C
NEW QUESTION # 27
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Downtime migration (EU_CLONE_MIG_DT_RUN)
- B. Uptime migration (EU_CLONE_MIG_UT_RUN)
- C. Shadow repository creation (EU_IMPORT*)
- D. ParaUel distribution (PARDIST_SHD)
Answer: B
NEW QUESTION # 28
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In SUM Parameters
- B. In SUM Phaselist
- C. In Process Control Center
- D. In DMO Migration Preparation
Answer: A,C
NEW QUESTION # 29
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
Answer: B
NEW QUESTION # 30
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phases EU_IMPORT*
- B. Phase RUN_RSPTBFIL _ISUTABU
- C. Phase RUN_RSDBSCPY
- D. Phases DIFF*
- E. Phase DOWNCONF_DTTRANS
Answer: A,D,E
NEW QUESTION # 31
......
SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Free Update With 100% Exam Passing Guarantee: https://examcertify.passleader.top/SAP/E_S4HCON2022-exam-braindumps.html