Free Apr-2026 E-S4CON-2505 Dumps are Available for Instant Access [Q21-Q37]

Share

Free Apr-2026 E-S4CON-2505 Dumps are Available for Instant Access

View All E-S4CON-2505 Actual Exam Questions Answers and Explanations for Free


SAP E-S4CON-2505 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Manual interventions during a system conversion: This section of the exam measures the skills of SAP System Administrators and covers the manual steps required during a system conversion. It includes tasks that cannot be automated and require technical oversight, ensuring that system stability and data integrity are maintained throughout the process.
Topic 2
  • Downtime optimization and execution: This section of the exam measures the skills of Technical Consultants and covers methods to optimize downtime during a system conversion. It emphasizes strategies to reduce business disruption, ensure smooth execution, and apply best practices for time-efficient conversion activities.
Topic 3
  • Activities before starting a system conversion: This section of the exam measures the skills of SAP System Administrators and covers the essential tasks required before beginning a system conversion. It focuses on preparing the system environment, checking compatibility, and ensuring that both technical and business prerequisites are fulfilled to minimize risks during the conversion process.
Topic 4
  • Preparing for the usage of Software Update Manager: This section of the exam measures the skills of Technical Consultants and covers preparation for working with the Software Update Manager tool. It focuses on understanding SUM’s role in executing conversions, configuring its settings, and applying it effectively to achieve successful project outcomes.

 

NEW QUESTION # 21
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?

  • A. After SUM has ended
  • B. During the Post processing roadmap step
  • C. During the Preprocessing roadmap step
  • D. Before the start of the SUM technical downtime

Answer: A


NEW QUESTION # 22
You are running an SAP ECC system .
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Apply SAP Support Packages.
  • B. Perform an SAP S/4HANA conversion including DMO.
  • C. Upgrade the SAP system.
  • D. Perform an SAP S/4HANA conversion without DMO.
  • E. Use DMO for SUM.

Answer: A,C,E


NEW QUESTION # 23
You are performing an in place SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?

  • A. The start of the Execution roadmap step
  • B. The start of the business downtime
  • C. The end of the business downtime
  • D. The end of the database migration

Answer: C


NEW QUESTION # 24
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Standalone AS ABAP with SAP BASIS 752
  • B. SAP Solution Manager 7.2
  • C. SAP S/4HANA Server 2022
  • D. SAP ECC system from SAP ERP 6.0 EHP 8

Answer: A,C


NEW QUESTION # 25
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.

  • A. TABIM UPG
  • B. TABIM_SHADOW_INC
  • C. PARMVNT_UPG
  • D. PARDIST_SHD

Answer: A,C


NEW QUESTION # 26
What is the benefit of using the UPGANAXML file from a previous SUM run?

  • A. To auto-fill specific fields on selected screens on the SUM UI
  • B. To skip selected phases during the SUM run
  • C. To repeat specific phases during the SUM run
  • D. To make the progress information within SUM UI more accurate

Answer: D


NEW QUESTION # 27
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column.
What does the Calculated level indicate for those software components?

  • A. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • C. The SAP Support Packages that will be bound to the conversion
  • D. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner

Answer: A


NEW QUESTION # 28
Which of the following are valid options to check the progress of an in place SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check the log files written in the SUM directory, subdirectory a bap, subdirectory log
  • B. Check the dump size of the database export in the SUM directory, subdirectory a bap, subdirectory load.
  • C. Check the Charts Control Center in the SUM UL
  • D. Check logs for jobs starting with RSUPG SGEN in the SAP system.

Answer: A,C


NEW QUESTION # 29
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.

  • A. You can verify that the content of the download directory matches the stack XMML file.
  • B. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can find the optimal number of parallel R3load processes by monitoring host performance.

Answer: B,D


NEW QUESTION # 30
How does SUM recognize modification adjustment transports from predecessor systems?

  • A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • B. By searching for transport requests named <sid>KO<number>
  • C. By searching for transport requests that are assigned to project SAP ADJUST
  • D. By searching for transport requests in file umodauto.lst

Answer: D


NEW QUESTION # 31
You want to perform an SAP S/4HANA conversion using SUM with in place DMO.
Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answers to this question.

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Creation of application tables in the SAP HANA database in phase
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
  • E. Import of upgrade and language data from the download directory in phase TAABIM UPG

Answer: A,C,E


NEW QUESTION # 32
Which orchestration tool facilitates a move to SAP cloud by wrapping different scenarios such as Lift&Shift or system conversion to SAP S/4HANA?

  • A. RISE with SAP system transition workbench
  • B. SAP migration cockpit
  • C. SAP Business Transformation Center
  • D. Software Orchestrator

Answer: A


NEW QUESTION # 33
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?

  • A. The path is taken from the URL entered in the browser to start SUM.
  • B. The path was stored to the environment of user <sid>adm during registration.
  • C. The path was stored in file host profile during registration.
  • D. The path was stored in file sumabap.conf during registration.

Answer: D


NEW QUESTION # 34
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. Import a transport request from the development system that contains the recording of the activation.
  • B. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • C. During conversion, SUM delivers some business functions already activated.
  • D. Activate the required business functions manually in the production system.

Answer: A,C


NEW QUESTION # 35
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?

  • A. Downtime conversion
  • B. Shadow on target creation
  • C. Silent data migration (SDM)
  • D. Downtime migration

Answer: D


NEW QUESTION # 36
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the migration
  • B. To optimize the main import
  • C. To optimize the activation
  • D. To optimize the conversion

Answer: A


NEW QUESTION # 37
......

The Most In-Demand E-S4CON-2505 Pass Guaranteed Quiz : https://examcertify.passleader.top/SAP/E-S4CON-2505-exam-braindumps.html