NEW QUESTION # 17
What options does a planner have in the planning table for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Create new production quantities.
- B. Change the assignments of production quantities to production lines.
- C. Dispatch operations to work centers.
- D. Reschedule deallocate operations.
Answer: B,D
NEW QUESTION # 18
Where does the system check master data selection settings during the creation of planned orders production orders?
Note: There are 3 correct answers to this question.
- A. In the work centers
- B. In the routing
- C. In the MRP controller
- D. In the production version
- E. In the bill of material (BOM)
Answer: B,C,E
NEW QUESTION # 19
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Intelligence
- B. SAP Signavio Process Governance
- C. SAP Signavio Process Manager
- D. SAP Signavio Process Insights
Answer: B,C
NEW QUESTION # 20
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning?
Note: There are 2 correct answers to this question.
- A. Create an object selection variant for alerts according to the priority of ATP categories.
- B. Assign the alert profile to the overall profile.
- C. Create an object selection variant for productionplanningrelated alerts.
- D. Assign the overall profile to the authorization profile.
Answer: B,C
NEW QUESTION # 21
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching?
Note: There are 2 correct answers to this question.
- A. The work center has several individual capacities.
- B. The Finite Scheduling indicator is NOT set in the strategy profile.
- C. Alternative work centers are fully occupied.
- D. The Change Planning Direction indicator is set in the strategy profile.
Answer: A,B
NEW QUESTION # 22
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Setup time
- B. Total replenishment lead time
- C. Float after production
- D. Opening period
Answer: A,C
NEW QUESTION # 23
What determines whether the planned independent requirements in dem management are consumed by other requirements?
Note: There are 2 correct answers to this question.
- A. Order type
- B. Requirements profile
- C. Requirements type
- D. Planning strategy
Answer: C,D
NEW QUESTION # 24
You want to trigger inhouse production of a semifinished material before a sales order for the corresponding finished good is received.Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semifinished material?
- A. Planning at assembly level (70)
- B. Planning with final assembly (40)
- C. Production by lot size (30)
- D. Assembly processing with production orders (82)
Answer: A
NEW QUESTION # 25
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material status
- B. By period
- C. By material type
- D. By plant
Answer: B,D
NEW QUESTION # 26
How can you support a GMP (Good Manufacturing Practice) compliant production process?
Note: There are 3 correct answers to this question.
- A. GMPcompliant flag
- B. Batch record
- C. Approved resources
- D. Recipe approval
- E. Digital signature
Answer: B,D,E
NEW QUESTION # 27
What generates capacity requirements in a process order?
Please choose the correct answer.
- A. Phases
- B. Activities
- C. Resources
- D. Operations
Answer: A
NEW QUESTION # 28
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.
- A. Establish regular housekeeping tasks procedures.
- B. Establish an organizational structure technical foundation transformation methodology for clean core.
- C. Integrate clean core practices in the endtoend value process chain.
- D. Define roles responsibilities as part of a process transformation office.
- E. Establish release management.
Answer: B,D,E
NEW QUESTION # 29
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.
- A. Scheduling agreement schedule line
- B. Purchase order
- C. Production order
- D. Planned order
Answer: A,D
NEW QUESTION # 30
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender?
Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Operation duration
- C. Total replenishment lead time
- D. Inhouse production time
Answer: A,D
NEW QUESTION # 31
What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. BOM header status
- B. BOM component status
- C. Manufacturing date
- D. Lot size
Answer: C,D
NEW QUESTION # 32
To trigger a goods receipt posting, which Kanban status do you have to set?
Please choose the correct answer.
- A. Wait
- B. Full
- C. In use
- D. Empty
Answer: B
NEW QUESTION # 33
What are the advantages of collective orders?
Note: There are 2 correct answers to this question.
- A. To perform availability checks across the entire collective order
- B. To post confirmations for the entire collective order
- C. To show the flow of batches across the entire collective order
- D. To coordinate orders in the planning board for a collective order
Answer: A,B
NEW QUESTION # 34
Which of the following processes lead to an entry in the MRP planning file?
Note: There are 2 correct answers to this question.
- A. Changing the delivery address in transportation management
- B. Changing the stock in inventory management
- C. Changing the storage bin in warehouse management
- D. Changing the procurement type in the product master
Answer: B,D
NEW QUESTION # 35
You are trying to create a production order NO valid production version can be selected.
What could be the reasons?
Note: There are 2 correct answers to this question.
- A. NO bills of material (BOMs) are assigned to the production versions.
- B. All production versions for the material are locked.
- C. NO production lines are assigned to the production versions.
- D. The order lot size is NOT within the validity range of a production version.
Answer: B,D
NEW QUESTION # 36
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Use a special item category in your material BOM (bill of material).
- B. Select a special MRP type inside the material master.
- C. Define the special procurement type inside the material BOM (bill of material).
- D. Select a special procurement type inside the material master.
Answer: C,D
NEW QUESTION # 37
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. MRP creates a dependent requirement.
- B. A sales order is delivered.
- C. MRP creates a planned order.
- D. A sales order is created.
Answer: D
NEW QUESTION # 38
Which time elements are part of a routing operation?
Note: There are 3 correct answers to this question.
- A. Setup time
- B. Wait time
- C. Processing time
- D. Pick time
- E. Float before production
Answer: A,B,C
NEW QUESTION # 39
You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative planning horizon.
- B. Specify a negative PP/DS horizon.
- C. Specify a negative opening period.
- D. Specify a negative offset time.
Answer: D
NEW QUESTION # 40
......