[UPDATED 2026] Read C_TS422_2504 Study Guide Cover to Cover as Literally [Q16-Q35]

Share

[UPDATED 2026] Read C_TS422_2504 Study Guide Cover to Cover as Literally

100% Real & Accurate C_TS422_2504 Questions and Answers with Free and Fast Updates


SAP C_TS422_2504 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Material Requirements Planning in SAP S
  • 4HANA: This section of the exam measures the skills of SAP Supply Chain Consultants and covers the core principles of material requirements planning (MRP). It assesses how consultants manage inventory and ensure material availability.
Topic 2
  • Introduction to SAP S
  • 4HANA Production Planning: This section of the exam measures the skills of Production Planning Specialists and focuses on the key concepts of production planning within SAP S
  • 4HANA. It introduces the main features and functions needed to plan manufacturing operations effectively.
Topic 3
  • Master Data in SAP S
  • 4HANA: This section of the exam measures the skills of SAP Supply Chain Consultants and focuses on managing critical master data elements in S
  • 4HANA. It ensures candidates can maintain and utilize accurate data for smooth supply chain operations.
Topic 4
  • Process Orders in SAP S
  • 4HANA: This section of the exam measures the skills of Production Planning Specialists and focuses on process manufacturing through process orders. It evaluates candidates’ understanding of process-specific functions in SAP S
  • 4HANA.
Topic 5
  • Production Orders in SAP S
  • 4HANA: This section of the exam measures the skills of Production Planning Specialists and evaluates their ability to work with production orders. It includes knowledge of order creation, scheduling, execution, and monitoring within SAP S
  • 4HANA.
Topic 6
  • Advanced Planning in SAP S
  • 4HANA: This section of the exam measures the skills of Production Planning Specialists and emphasizes advanced planning techniques. It focuses on complex scenarios, optimization methods, and tools available in SAP S
  • 4HANA to ensure efficient production scheduling.
Topic 7
  • Lean Manufacturing in SAP S
  • 4HANA: This section of the exam measures the skills of Production Planning Specialists and covers lean manufacturing concepts. It evaluates knowledge of simplified production processes that help reduce waste and improve efficiency.
Topic 8
  • Managing Clean Core: This section of the exam measures the skills of SAP Supply Chain Consultants and focuses on strategies to maintain a clean core in SAP S
  • 4HANA. It ensures that candidates understand how to manage system integrity while reducing unnecessary customizations.

 

NEW QUESTION # 16
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.

  • A. The basic end date of the order must lie within the validity period of the production version.
  • B. The production quantity must only lie within the lot-size range of the routing in the production version.
  • C. The production version must NOT be deleted.
  • D. The production quantity must lie within the lot-size range of the production version.
  • E. The basic start date of the order must lie within the validity period of the production version.

Answer: B,D,E


NEW QUESTION # 17
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.

  • A. When you release the batch
  • B. When you record inspection results
  • C. When you execute batch determination
  • D. When you post the goods receipt

Answer: B,D


NEW QUESTION # 18
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.

  • A. They are created with exact times in Advanced Planning.
  • B. They are created on assembly level during the planning run.
  • C. They are created together with the independent requirement for the finished product.
  • D. They are only created for multilevel bill of material (BOM) structures.

Answer: A,B


NEW QUESTION # 19
What does the material type influence?
Note: There are 2 correct answers to this question.

  • A. Which document types and class categories are allowed
  • B. Which number range interval the material number comes from
  • C. Which plant-specific and plant-independent statuses are allowed
  • D. Whether value changes to financial accounting stock accounts are updated

Answer: B,D


NEW QUESTION # 20
Which order type is used for repetitive manufacturing?

  • A. Production order
  • B. Planned order
  • C. Process order
  • D. Kanban order

Answer: B


NEW QUESTION # 21
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.

  • A. Storage location MRP areas are required to manage sales-order-specific stock.
  • B. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
  • C. Net requirements calculation is carried out for every sales order individually.
  • D. Production and procurement costs are managed on the sales order item level.
  • E. Planned orders are created in MRP with reference to sales orders.

Answer: C,D,E


NEW QUESTION # 22
How do you model a production line in repetitive manufacturing?

  • A. Asan operation
  • B. As a resource network
  • C. routing
  • D. As awork center
  • E. Asa

Answer: D


NEW QUESTION # 23
Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

  • A. Use a resource group.
  • B. Use a planning group.
  • C. Use a planning area.
  • D. Use a propagation range.

Answer: A


NEW QUESTION # 24
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.

  • A. You post the entire manufactured quantity to one batch if the product quality changes during production.
  • B. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
  • C. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
  • D. You post the entire manufactured quantity to multiple batches if the product quality changes during production.

Answer: C,D


NEW QUESTION # 25
For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.

  • A. In productrelated COC all costs are debited credited to a product cost collector.
  • B. Orderrelated COC is beneficial in a flexible production environment.
  • C. Productrelated COC is used in manufacturing for coproducts.
  • D. In orderrelated COC individual production orders do NOT have cost segments.

Answer: A,B


NEW QUESTION # 26
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.

  • A. Dependent requirements
  • B. Historical values
  • C. Statistical procedures
  • D. Forecasting
  • E. Planning file entries

Answer: B,C,D


NEW QUESTION # 27
How would you define a pegging structure for an order in the context of Advanced Planning?

  • A. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
  • B. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
  • D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements

Answer: D


NEW QUESTION # 28
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched.
How does the insertion take place?

  • A. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
  • B. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
  • C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

Answer: D


NEW QUESTION # 29
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.

  • A. Customers can grant access to the dashboard to partners.
  • B. It can be used in all SAP S/4HANA Cloud editions.
  • C. Customers can use the dashboard in the dev, test, and production tenants.
  • D. It can be accessed by using SAP For Me.

Answer: A,D


NEW QUESTION # 30
Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.

  • A. Customers can use the dashboard in the dev test production tenants.
  • B. Customers can grant access to the dashboard to partners.
  • C. It can be used in all SAP S/4HANA Cloud editions.
  • D. It can be accessed by using SAP For Me.

Answer: B,D


NEW QUESTION # 31
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

  • A. Order (dispatched) chart
  • B. Work center capacities chart
  • C. Order (pool) chart
  • D. Capacity requirements chart

Answer: B,D


NEW QUESTION # 32
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

  • A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
  • B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
  • C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
  • D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator

Answer: D


NEW QUESTION # 33
What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Create new production quantities.
  • B. Dispatch operations to work centers.
  • C. Reschedule deallocate operations.
  • D. Change the assignments of production quantities to production lines.

Answer: C,D


NEW QUESTION # 34
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. A sales order is created.
  • B. MRP creates a dependent requirement.
  • C. A sales order is delivered.
  • D. MRP creates a planned order.

Answer: A


NEW QUESTION # 35
......